Underground Stations of 2nd Main Line – Munich

Munich, Germany
Location
Munich, German
Client
DB NETZE (DB Netz AG, DB Station & Service AG, DB Energie GmbH)
Planning period
2017 – ongoing
Services
Central Station: Project planning (Lph 2-6): preliminary, draft, approval and final design, preparation of tenders (incl. feasibility study and alternative variant analysis); structural engineering (Lph 2-6): preliminary, draft, approval and final design, preparation of tenders (incl. feasibility study and alternative variant analysis); Station Marienhof: Project planning (Lph 2-6): preliminary, draft, approval and final design, preparation of tenders; structural engineering (Lph 2-6): preliminary, draft, approval and final design, preparation of tenders; Station Ostbahnhof: Project planning (Lph 2-4, 6, 7): preliminary, draft and approval design, preparation and evaluation of tenders; structural engineering (Lph 2-4, 6, 7): preliminary, draft and approval design, preparation and evaluation of tenders
Construction field Central Station (© DB Netz AG / panterra)
Construction field Central Station (© DB Netz AG / panterra)
Course of 2nd main line (© DB Netz AG)
Course of 2nd main line (© DB Netz AG)
Longitudinal section of 2nd main line (© DB Netz AG)
Longitudinal section of 2nd main line (© DB Netz AG)
Model overview Central Station
Model overview Central Station
Visualisation: integrated overall solution of provisional structure U9, 2nd main line and new construction of station building (© Deutsche Bahn AG / Fritz Stoiber Productions GmbH)
Visualisation: integrated overall solution of provisional structure U9, 2nd main line and new construction of station building (© Deutsche Bahn AG / Fritz Stoiber Productions GmbH)
Visualisation of station Hauptbahnhof (Canyon), level -1 (© a4d architekten)
Visualisation of station Hauptbahnhof (Canyon), level -1 (© a4d architekten)

The 2nd main line for the regional trains and the new underground train U9 aim at alleviating the overloaded regional transport system in Munich. For this 2nd main line, SSF Ingenieure, as part of an engineering joint venture, designs the optimisation of the three underground stations Hauptbahnhof, Marienhof and Ostbahnhof. Moreover, at Central Station (Hauptbahnhof), for the future underground train line U9, a provisional structure will be planned in the framework of an integrated overall solution which allows a subsequent implementation of the underground train line.

Overall, the following project services are provided:

  • feasibility study of implementation of U9 and its integration into the 2nd main line
  • optimsation of station Marienhof in view of construction method
  • draft designs for stations Hauptbahnhof, Marienhof and Ostbahnhof
  • coordination of different disciplines within the engineering joint venture 
  • involvement in modifications to the construction applications of the draft design of all three stations
  • final design of stations Hauptbahnhof and Marienhof