S 21 Berlin (City Train Berlin), 3rd construction section

Berlin, Germany
Location
Berlin, Germany
Client
Federal State Berlin
Client
DB Netz AG, regional branch east
Joint venture
INGE S21, BA3a, comprising SSF Ingenieure AG and Amberg Engineering AG
Total length
2,1 km
Services
Joint venture: general planning for new construction of S21, 3rd construction section incl. surveying, geological consulting and planning permission report
SSF Services
Project planning (Lph 1 – 2): basic evaluation and preliminary design, optional (Lph 3 – 4, 6 – 7) draft and approval design, preparation and evaluation of tenders; structural engineering: basic evaluation and preliminary design, optional (Lph 3 – 4, 6 – 7) draft and approval design, preparation and evaluation of tenders; BIM design and management for all service phases
drone flight over the planned line of the 3rd construction section of S21 © Al-Survey
drone flight over the planned line of the 3rd construction section of S21 © Al-Survey
track surveying for the design of the 3rd section © DB Netz AG
track surveying for the design of the 3rd section © DB Netz AG
network survey for design of the 3rd section © DB Netz AG
network survey for design of the 3rd section © DB Netz AG
overall as-built model
overall as-built model
as-build model southern direction
as-build model southern direction
as-built model northern direction
as-built model northern direction
as-built model northern direction
as-built model northern direction

Regional train line S 21 creates a second north-south line of Berlin’s regional trains in the city centre. The new train line will connect the quarter Wedding to train station Südkreuz via Central Station and thus integrate the Central Station into the regional train ring. In a joint venture with Amberg Engineering AG, SSF Ingenieure is charged with the mentioned services in the third section, a 2.1-km long, double-tracked tunnel-bridge line between stations Potsdamer Platz and Yorckstraße as well as Yorckstraße/Großgörschenstraße.After leaving the underground station Potsdamer Platz, the alignment runs downtown crossing the triangular junction until it connects to the existing line at Yorckstraße, branching off into two lines. In the area of the triangular junction, a new station is built maintaining the existing traffic structures and connected to an underground station, stations Yorckstraße and Yorckstraße/Großgörschenstraße are expanded and renewed.