In the Sao Paulo quarter Itaim Bibi, in the night from March 21 to 22, three VFT girders weighing 3 tonnes were placed by mobile crane over the highly frequented Marginal Pinheiro and two tracks of the CPTM line. The span widths of the fully integral 2-span structure crossing the traffic route are 23.50m and 47.75m.
In direct vicinity another flyover was erected.
Project Passarela