Motorway A14, Wildlife Crossings

Karstädt, Germany
Client
DEGES Deutsche Einheit, Fernstraßenplanungs- und -bau GmbH; JOHANN B U N T E Bauunternehmung GmbH & Co.; KG BETAM GmbH
Planning period
08/2013 - 03/2015
Completion
2015
Services
(HOAI 2013) Project planning § 43, Lph 2, 3, 5, 6; Structural engineering § 51, Lph 2, 3, 4, 5, 6
Span widths
39.37 / 40 / 38.25

The wide-spanning frame structures of the three wildlife crossings are the first overfilled structures to be implemented with VFT®-WIB girders. The construction method with prefabricated composite elements and rolled girders in concrete (VFT®-WIB) is a development of the VFT method.

This composite construction method distinguishes itself by the innovative use of the materials steel and concrete in terms of material choice and their load-bearing capacity, as well as a high degree of prefabrication which results in efficient construction due to low transport weights and short assembly times.


For more information on VFT®-WIB construction method:

Entwicklung von neuen Bauweisen