Mobility Hub Augsburg

Augsburg, Germany
Location
Augsburg, Deutschland
Client
Stadtwerke Augsburg Projektgesellschaft mbH
tunnel length
405 m
Planning period
2014 – 2019
Services
Project planning of engineering structures § 43, Lph 3, 5–7 (draft design, final design, preparation and evaluation of tenders); Project planning of transport installations § 47, Lph 3, 5–7 (draft design, final design, preparation and evaluation of tenders); Structural engineering § 51, Lph 2–6 (preliminary, draft, approval and final design, preparation of tenders)
© Stadtwerke Augsburg/edgeflow
© Stadtwerke Augsburg/edgeflow
© Stadtwerke Augsburg/edgeflow
© Stadtwerke Augsburg/edgeflow
© Stadtwerke Augsburg/edgeflow
© Stadtwerke Augsburg/edgeflow

New construction of a tramway tunnel with a length of 405 metres, incl.:

  • underground tramway stations
  • direct accesses via the distribution levels to the railway platforms
  • extension areas for branch-offs
  • underpinning of the station building
  • tunnel undercrossing the shunting tracks with underground turning loop
  • forecourt west (earthworks) – shortening of the tunnel area
Back