Motorway A9, Munich – Nuremberg, Noise Protection Freimann

Munich, Germany
Location
Munich, Germany
Client
State of Bavaria, represented by German highway authority
Total Length
approx. 3 km
Services
preliminary, approval and final design, preparation and evaluation of tenders, workshop drawings and project management
Planning period
2001 - 2004
Construction period
2004 - 2005

The construction is situated in the northern part of Munich on both sides of the motorway A9 Nuremberg-Munich between the junction and the bridge of Freimann. The curved noise protection wall with a maximum high of 9.0 m is covered inside by high-absorptive aluminium corrugated iron sheets and outside by coffered aluminium panels. The noise protection extends over a distance of approx. 3 km.

Back