Workshop Extension Nuremberg

Construction at existing building: solutions in confined spaces

Werkstattverlängerung Nürnberg
35
metres

additional space for modern trains

Short design period and narrow construction field

  • Workshop hall Nuremberg Gostenhof extended by 35 metres for new Desiro-HC trains
  • Construction while operation continued– with dividing dust protection wall
Location
Nuremberg, Germany
Developer/Client
DB Regio Bavaria

Design period

2022 – 2023

Scope of services

Project planning and structural engineering for buildings and traffic installations

Start of operation
2024

For the new Desiro-HC trains, the DB Regio workshop hall in Nuremberg Gostenhof was extended by 35 metres. Now, the 105-metre-long four-part trains fit inside. The conversion comprises three maintenance tracks, one lifting jack track and adaptations at the eastern entry. Despite the narrow construction field and a short design period, operation at the workshop continued during the construction – divided by a dust protection wall.