Railway Bridge Lindwurmstrasse

New construction at the heart of Munich’s railway hub

Ersatzneubau Lindwurmstraße
17
Metre

Individual span widths

Replacement of historic railway bridge

  • Replacement of the more than 100-year-old, impossible to renovate railway bridge with a two-span WiB (rollerd girders in concrete) structure with individual span widths of around 17 metres.
  • Complex construction implementation in confined spaces with adjoining underground train tunnel, monument protected structures and continuing road traffic.
Location
Munich, Germany
Developer/Client
DB InfraGO AG

Scope of services

Project planning and structural engineering, construction supervision

Crossed tracks
6
Individual span widths
2x17 m

News and insights on the project

Read post

Important Milestone at Railway Bridge Lindwurmstrasse in Munich

Temporary bridges excavated and first superstructure successfully launched

Read post

Construction Site Visit Lindwurmstrasse Munich

Insight into the replacement of the historic railway bridge

Einhub an der Eisenbahnbrücke Lindwurmstraße
Read post

Spectacular Girder Placing at Railway Bridge Lindwurmstrasse

Steel girders for new bridge superstructure

Baustellenbesuch Lindwurmstraße Gruppenbild
Read post

SSF Employees Visit Construction Sites

Tour at the construction sites of the new Rahmede Viaduct and the replacement bridge at Lindwurmstrasse, Munich

Bauen im Bestand in Berlin-Kreuzberg
Read post

New Railway Bridge at Lindwurmstrasse

Construction starts for demolition and new construction of the historic bridge