Expansion Föhringer Ring Road

Bottleneck with prospective relief

Ausbau Föhringer Ring
1.9
kilometres

4-lane expansion

Traffic hub at river Isar

  • Four-lane expansion of Föhringer ring road on 1.9 km length
  • New construction of several bridges over Isar river and at the English Garden over the streams Garchinger Mühlbachand Schwabinger Bach and Sondermeiserstrasse
  • Noise protection, species protection and traffic management with ongoing traffic
Location
Munich, Germany
Developer/Client
Construction Authority Freising

Design period

2018 – 2027

Scope of services

Construction management and on-site construction supervision, project management  

Completion
2030 (planned)
Ausbau Föhringer Ring
  • Föhringer ring road is one of the most frequented traffic hubs in the north of Munich – and has long reached its capacity. To reduce congestion and to future-proof the traffic link, the road will be expanded to four lanes on around two kilometres.
  • This includes the new construction of several bridges, amongst them two large crossings over Isar river, each 154 metres long. In addition to roads and engineering structures, noise protection measures as well as comprehensive landscaping and species protection projects play a central role.
  • During the entire construction period, traffic will keep moving – a particular challenge for designers and builders.