Arch Bridge Near Wasserlosen

New construction of a slender double-joint arch bridge over motorway A7

Bogenbrücke bei Wasserlosen
73
Metre

Span width

Innovative construction in detail

  • Circularly bent steel arch made of four-cell boxes, tapering in thickness from 0.60 metres to 0.35 metres.
  • Radially arranged, 0.30 to 0.36 metre-thick four-cell steel piers.
  • Deck slab concreted on 4-metre-wide steel slab with welded T-profiles, which, together with the arch and the piers, creates a stable Vierendeel system.
  • Arch thrust transferred into the rock by concrete abutment foundations and linear stainless steel tilting bearings.
Location
Motorway A7 between junction Wasserlosen and interchange Schweinfurt / Werneck
Developer/Client
Die Autobahn GmbH des Bundes, branch North Bavaria

Service period

2020  – 2022

 

Scope of services

Project planning and structural engineering, 3D modelling with plan generation during detailed design

Construction execution
2022 – 2025
Span width
73 m
Bridge area
704 m²
Bogenbrücke bei Wasserlosen

Construction phase