Completion of First Stage in Gdanks

Harbour crossing/Tunnel under the Dead Vistula

The inner-urban Sucharski route improving access to the harbour of the city of Gdansk has a total length of around 8,430m and is divided into three design sections. The general scope of services of SSF Ingenieure AG, in joint venture with EUROPROJEKT Gdansk and in close cooperation with Wagner Ingenieure Munich, comprises the overall design until final design.

Lot 3 with a length of around 2,610m encompassed among others the crossing of the harbour basin of the Dead Vistula, the ‘Martwa Wisla’, by a 1,072.50m long tunnel constructed by hydro-shield with a 12.50m diamet