Demolition of the old Beverungen Bridge over Weser River

Last week, the almost 70-year old Beverungen Bridge over Weser River was demolished.

Construction of the new replacement structure between Beverungen and Lauenförde is managed and supervised on site by SSF Ingenieure in Halle who’s also charged with supervising the manufacturing of the steel structure.

 

Links with images and videos of the demolition.

Article in Westfalen-Blatt on 17/07/2019 (in german)

Image gallery in Lauenförde Aktuell (in german)

 

Construction period: 10/2017 – 05/2020

Total span width: 199.90 m

Steel construction: ca. 900t

 

SSF services:

  • Construction management and on-site supervision
  • Technical plan analysis
  • Contract addendum management
  • Supervision of steel manufacturing at the plan and on site