New Publication: Project Folder Elisabeth Bridge

19. February 2025

New publication of project folder Elisabeth Bridge: pioneer project by VTR® construction method!

In our new project folder, you learn everything about the first bridge in Germany built by the innovative VTR® method!

ADVANTAGES OF VTR®-METHOD

  • Very short and efficient construction times
  • Interferences in traffic underneath (road, rail, waterways) are significantly minimised
  • Significantly shorter traffic interference, less congestion, reduced CO 2 emissions/li>
  • High degree of prefabrication (steel structures, prefabricated concrete elements)
  • Increased quality and efficiency through consistent fabrication conditions at the plant
  • Robust and simple construction method
  • Compact and durable concrete structure through use of high-performance concrete
  • High adaptability of modules, adjusted to specific project requirements
  • High level of flexibility in the positioning of columns in view of underpassing traffic
  • VTR® superstructures can be launched like conventional composite bridges, including already pre-mounted cross girders
  • Simple and safe construction of planned gradient because of cross girder adjustability
  • Construction method can be used even in case of narrow radii and clothoids
  • Ideally use of prefabricated bridge cap elements

Here you can download the folder.