Construction Site Visit at Einetal Viaduct

Baustellenbesuch an der Einetalbrücke

13. May 2026

Our Halle colleagues gained interesting insight in one the region’s largest bridge construction projects

This week, some of our colleagues from our Halle offices had the opportunity to visit the construction site Einetal viaduct, part of national road B180 town bypass Aschersleben/South-Quenstedt. On site the dimensions of this large-scale project became clear quickly, as well as the technological and logistical challenges the project presents.

The project comprises the new construction of an around 8.4-kilometre-long section of national road B180 and closes the gap of the frequented connection between motorways BAB38 and BAB14 via BAB36. At the centre of the project is the 11-span Einetal viaduct, a prestressed concrete hollow box erected by incremental launching.

Particularly remarkable, in addition to the size of the structure, are the numerous technological and ecological requirements: the structure is located in a flora and fauna habitat as well as partially in a flood zone of river Eine. Comprehensive protections for animals such as the sand lizard and bats also play an important role.

The site visit offered interesting insights into modern bridge engineering and complex procedures of an infrastructure project of this scale.

Structure data

Crossing angle
100 gon
Clear width between abutments
399 m
Span widths
26 m - 7x39.50 m - 37.50 m - 31.50 m - 29.50 m
Total span width
401 m
Smallest clear height
ca. 2,65 m (abutment axis 120)
Max. clear height above valley
ca. 23 m
Width between railings
11.70 m
Bridge area
ca. 4,692 m²